300 Marks
Instructions
Details of a Model Steam Locomotive are shown on the accompanying drawings.
1. Make and assemble the project using the materials specified in the Parts List.
2. Design, make and attach a removable Inspection Cover for the front of the Boiler.
3. Complete the electric circuit, which should be housed in the Boiler and test with 2 x 1.5V AA batteries.
Parts List
As Supplied
| Part No. | Part Name | Required | Material and Description |
| 8 | SWITCH | 1 | AS SUPPLIED (Ø5MM) |
| 9 | MOTOR | 1 | Ø24X27 (1.5V - 3V) |
| 10 | MOTOR HOLDER | 1 | SELF-ADHESIVE TYPE |
| 11 | PULLEY | 1 | TO SUIT AXLE |
| 12 | PULLET | 1 | TO SUIT MOTOR |
| 13 | DRIVE BELT | 1 | TO SUIT PULLEYS |
| 14 | BATTERY HOLDER | 1 | AS SUPPLIED |
| 15 | INSULATED WIRE | AS REQUIRED | AS SUPPLED |
| 16 | M3X12 SET SCREW | 7 | STEEL OR BRASS |
| 17 | M3 HEX NUT | 9 | STEEL OR BRASS |
| 18 | M4 HEX NUT | 4 | STEEL OR BRASS |
| 19 | M4 CAP NUT | 4 | STEEL OR BRASS |
Design Element
Zip Files
Download all Solidworks Parts : - 1.2MB
Download all Solidworks Drawings : - 1.4MB
Download all PDFs of Solidworks Drawings : - 371KB
Download Solidworks Assembly including all Parts : - 13.8MB
Download Assembly Pictures : - 644KB
Download All : - 19.2MB
